Radius Plastics Ltd
New Factory, Lurgan
New Factory Development
Our Practice designed the original factory and offices as well as two previous extensions to their premises in Banbridge. We were engaged to design a new factory to incorporate the facilities of the Banbridge Plant and the relocation of the Plant in Cork. The layout of this new £4M development was to allow for future expansion of a Production Bay as well as an administration Block, each at either ends of the new building. The programme was extremely tight as the machinery from the factory in Cork had to be delivered on a particular date to accommodate the closing of the factory. This new factory houses complex services and the tolerances to the beams supporting the overhead cranes and the floor finishes where the Production Machinery would be located were tight. Extensive works were carried out to the site to improve poor ground conditions. The Project was completed November 2008.