Campbell College
Boarding Dept
Boarding Department
The College each year refurbish a section of its Listed Building stock, to keep them in a healthy state of repair and to get use of them, if possible. It is a continuous job. Hobart and Heron were tasked with transforming a former 3-storey classroom building of small teaching rooms, which had seen better days, into the new Boarding Department. Externally the roofs gutters and brickwork were replaced and internally the floors were transformed into Bedroom Dormitories, Shower rooms, TV room, Games room, and Sickbay and Staff overnight accommodation. Fire protection was a major element of the works, along with removal or dry and wet rot which was prevalent in places. Floors were also upgraded and new mechanical and electrical services were provided. This all happened in record time, to open for the new summer term.